148 - The Ministry Westfield
The Ministry project is located between Ariel Way and the main concourse leading from Shepherds Bush underground station in the Southeast corner.
The existing House of Fraser Department store demise is made up of an entrance lobby at Level 30 and retail floors above on Levels 40, 50 and 55 which is to be removed and replaced with the Ministry office space. The works are to reconfigure the existing SE Anchor (House of Fraser) into office demise to CAT A Fit-Out level. The works comprise of the following structural changes, escalators from Level 50 to 55 to be removed and escalators from Level 40 to 50 to be removed. Façade changes include a new glazed opening to be formed in existing external wall to South elevation at levels 40, 50 and 55, new glazed openings to be formed in existing external wall to east elevation at levels 40, 50 and 55 and existing glazed screen to Level 30 entrance to be removed for a new extension.
Cat A office fit-out to be in line with British Council of Offices Guide to Specification 2019 for refurbishments. Borough Engineering’s works shall include for all necessary design (Stage 4A onwards), labour, plant, equipment, materials, testing, commissioning, setting to work, supervision, and management, to carry out and complete the Mechanical, Electrical, Plumbing, Sprinkler and associated Works package. Including any necessary temporary works and temporary works design.

Project Summary


Project Value
£15,000,000

Client
The Ministry

Main Contractor
Unibail-Rodamco-Westfield

